Power battery PACK automatic production line (AGV)
01 The lower cabinet is automatically online.
02 Install the box connector.
03 Reserved work space.
04 Modules are automatically put into the box.
05 Module pre-tightening.
06 The module is automatically tightened.
07 Install the collection harness.
08 Install BDU.
09 Soft connection fixed.
10 Install the high-voltage wiring harness.
11 BMS installation.
12 reserved workstations.
13 Connect the water cooling pipes.
14 Water-cooled air tightness test.
15 EOL test.
16 DCR Test 1.
17 DCR Test 2.
18 Paste the sealing strip.
19 Automatic upper cover installation.
20 Pre-tighten the upper cover.
21 The upper cover is automatically tightened.
22 reserved workstations.
23 The battery pack is offline.
PARAMETER FORM
Basic parameters
parameter value
Equipment size
40*15*25m
Single line capacity
≥12JPH
Production line yield
≥99%
Production line utilization
≥95%
How to order an automatic machine for your product?
Share us the picture in different angles of your product.
Share us the drawing of your product.
CONTACT US
Email:colin@xmsinuowei.com Tel:+86 18150116901
Whatsapp:+86 18150116901
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
Service online