Power Battery PACK Automatic Production Line (AGV)
Power battery PACK automatic production line (AGV) 01 The lower cabinet is automatically online 02 Install the box connector 03 Reserved work space 04 Modules are automatically put into the box 05 Module pre-tightening 06 The module is automatically tightened 07 Install the collection harness 08 Install BDU 09 Soft connection fixed 10 Install the high-voltage wiring harness 11 BMS installation 12 reserved workstations 13 Connect the water cooling pipes 14 Water-cooled air tightness test 15 EOL test 16 DCR Test 1 17 DCR Test 2 18 Paste the sealing strip 19 Automatic upper cover installation 20 Pre-tighten the upper cover 21 The upper cover is automatically tightened 22 reserved workstations 23 The battery pack is offline.